ALP1

Facts

Location

Lucerne (Central Switzerland)

DC building type

Standard

Operator

CKW Fiber Services AG

Energy source

CO2-neutral operation

-

ISO/IEC 27001 certified

FINMA-RS 18/3 compliant

Energy suppliers

The data center obtains its energy from its parent company, CKW AG, and is redundantly connected by two lines to the energy grid.

Emergency power supply

The data center can be operated self-sufficiently for at least 72 hours (at full capacity, without refueling) using their diesel generators and on-site diesel supplies. This easily bridges possible rolling grid outages. In addition, the operator possess reserved external diesel supplies. The data center can be operated as long as necessary by refilling the tanks.

Last updated