The data center obtains its energy from its parent company, EWL Energie Wasser Luzern Holding AG, and is redundantly connected by two lines to the energy grid.
The data center can be operated self-sufficiently for at least 72 hours (at full capacity, without refueling) using their diesel generators and on-site diesel supplies. This easily bridges possible rolling grid outages. In addition, the operator possess reserved external diesel supplies. The data center can be operated as long as necessary by refilling the tanks.
Location
Lucerne (Central Switzerland)
DC building type
Bunker
Operator
ewl Rechenzentrum AG
Energy source
CO2-neutral operation
✅
ISO/IEC 27001 certified
✅
FINMA-RS 18/3 compliant
✅